Assets and systems

Asset Management

Asset management provides a single source of truth for the asset register, verified on the floor rather than exported from a spreadsheet, and a lifecycle strategy that runs from acquisition through decommissioning.

What goes wrong

The register and the room disagree.

You cannot maintain what you cannot name. Most registers we inherit are a spreadsheet that was accurate on the day it was exported, and the gap between it and the floor is where unplanned failure lives.

Accurate on the day it was exported.

Two vendors and one refresh later, the register lists equipment that has gone and misses equipment that arrived. Nobody decided to let that happen. There was simply no process requiring the register to change when the building did.

  • Assets on the floor with no tag and no record
  • Records for equipment that left the site years ago
  • Three versions of the register, all of them in use

Replacement timing comes off failure, not condition.

Without age and condition against each asset, the replacement argument is anecdotal, so it loses to whatever is better evidenced. The equipment then runs to failure, and an unplanned replacement costs more than the planned one would have in a worse week.

  • Capital requests with no condition data behind them
  • Replacement decided by failure rather than by plan
  • No spares strategy, because nothing says what is critical
How we run it

How a register becomes true and stays true.

The equipment list is verified rather than believed, and the verification is itself audited. We walk every register we build on the floor. There is no other way to make one true.

  1. 01

    Walk the floor and verify every asset

    Asset by asset, in the room, against the register. This is the slow part, and it is the only step that makes everything after it worth doing.

    Verified registerEvery asset confirmed in the room it sits in
  2. 02

    Rank by criticality, capture condition

    Each asset takes a criticality off what it carries and a condition off what it is. Those two fields are what turn a list of equipment into a maintenance and capital strategy.

    CriticalityA consequence rank and a condition, per asset
  3. 03

    Write the lifecycle, the bills of material, and the spares

    Acquisition through decommissioning, with BOMs and a spares strategy that follows criticality rather than whatever the stores happen to hold.

    Lifecycle planReplacement timing, BOMs, and a spares strategy
  4. 04

    Keep it true as the building changes

    A change to the building becomes a change to the register, with an owner. Without that step the whole thing is accurate once and drifting from the day after.

    GovernanceA building change becomes a register change
Asset Management

What we run on your assets.

The register, the criticality, and the lifecycle strategy come from us. The equipment and the people who touch it stay yours.

Talk to an operator
  • A verified, single-source-of-truth asset databaseVerified on the floor asset by asset, so the register and the equipment in the room agree.
  • Lifecycle strategy from acquisition through decommissioningAcquisition through decommissioning, so replacement timing comes off condition and age rather than off failure.
  • Predictive maintenance, BOMs, spares strategy, and inventory controlPredictive intervals, BOMs, spares strategy, and the inventory to support them.
  • Real-time dashboards and CAPEX planningCondition data that turns a capital request into a forecast you can defend.
Measured outcomes

What a true register is worth.

The figure below is the verified accuracy we hold at L5 commissioning, asset by asset, against the equipment actually installed. It is a measurement taken on the floor rather than a target set in a document.

95%verified asset accuracy

at or above, at L5 commissioning, verified in the room rather than from a document

25%

Asset life extension

Fewer

Unplanned failures, sharper forecasting

Benchmarked toISONFPASMRP
Straight answers

What operators ask us first.

These questions come up once somebody has admitted out loud that the register is wrong.

Our asset register is a spreadsheet. Where do you start?

We start on the floor. You cannot maintain what you cannot name, and most registers we inherit were accurate on the day they were exported. The gap between that file and the equipment in the room is where unplanned failure lives, so the first priority is a verified register rather than a tidier spreadsheet.

How do you verify an asset register?

We perform a physical walkdown against the record, asset by asset, correcting tagging and hierarchy in place. It is unglamorous, and it is the only method that produces a number you can plan against.

What does "95% verified accuracy at L5 commissioning" mean?

L5 is the final commissioning level, where systems are proven under integrated load. Arriving there with better than 95% of the register verified means the maintenance program starts against real data on day one instead of being rebuilt during the first year of operation.

Do you physically tag the assets?

Yes, we physically tag assets as part of the walkdown, so the label in the field and the identifier in the system are the same string. A register that does not match the tag on the unit sends a technician to the wrong asset, which is worse than having no register at all.

How does asset management change CAPEX planning?

Lifecycle strategy runs from acquisition through decommissioning, so replacement timing comes off asset condition and age rather than off whatever failed most recently. That is what turns a capital request into a forecast and the source of the 25% asset life extension.

Not the question you have? Send it over, and one of the people who would actually run your site will answer it.

Ask an operator
Where to start

Start with what the register actually says.

Both routes end with a register the building agrees with. What differs is whether we are correcting one or building the first.

It exists, and the crew works around it.

We sample it against the floor first, which gives you a defensible number for how wrong it is. That number is usually what wins the budget for the full verification.

Equipment is arriving, and nothing has been tagged.

Tagging during installation is the cheapest verification there is, because the asset is in front of you with its nameplate exposed. After handover the same work costs several times as much for a worse result.