Handovers arrived incomplete
No asset data, no work management system, no maintenance plans. The documents closed the contract and left the operator to build the operation from nothing, in production.
Case study
Operations had been treated as something that starts after construction ends. The result was a building handed over with no asset data, no work management system and no maintenance plan, and design decisions that were expensive to undo by the time an operator saw them.
Nothing here is a construction failure. Each handover was complete by the terms it was measured against. The terms never included whether anyone could run the building.
No asset data, no work management system, no maintenance plans. The documents closed the contract and left the operator to build the operation from nothing, in production.
Access, maintainability and isolation problems discovered once the plant was installed, where the cheapest available fix is always more expensive than a drawing change would have been.
No verified register meant no way to know what was covered, what was installed, or whether the tag on the equipment matched anything in a system.
The whole program is one idea applied four ways: every operational question gets asked while it is still cheap to answer.
Access, maintainability and isolation checked against the maintenance tasks the building will actually run, before the plant is installed. On this program that caught an average of more than a hundred and seventy issues per site, each one fixed on a page.
The work management program stood up while the building was still being built, so the processes the operator will use on day one have been in place long enough to be real rather than being introduced at turnover.
Asset onboarding into an aligned EAM and CMMS, with every tag checked against what is physically installed. The register reached better than 95% verified accuracy before anybody was asked to raise a work order against it.
Maintenance plans and a spare parts strategy in place at go-live, so the first failure is a scheduled response rather than a procurement exercise.
Problems were removed while they were still cheap to fix, and the asset register was verified before the operating team ever needed it, which is why the building opened running instead of catching up.
170+issues
Hidden issues found and resolved per site before Day Two, on a hyperscale development program, averaged across sites rather than a single best case.
95%
asset data accuracy
Catapult™ redefines data center development by making operations a front-end priority not an afterthought. We achieve faster turn-up lower total cost and seamless standardization.
Development Director, major data center developer
Catapult™ is a program rather than a discipline, and at the gate it hands into these.
Bring us the scope and we will say plainly whether we are the right operator for it, and what the first ninety days would look like.